Project Statistics

Location
Southbank, Melbourne Victoria
Client
Transurban
Industry
Engineering
Size
450 tonnes

As can be seen from the pictures to your right, the exhaust stack was a large pipe fabrication especially designed to extract fumes from the Citylink tunnel.

Precise tolerances had to be adhered to to meet clients specification and the fixed non adjustable bracing system. The paint system selected was a bright red automotive finish

Download Project PDF
Let's discuss your next project: