Project Statistics
- Location
- Clayton Victoria
The contract for the Monash Carpark level 3 and 4 was awarded to
Page Steel Fabrications in 2015. The project comprised of an
additional two levels of steelwork to the existing steel
structure.
The project drafting was performed in house and totaled
approximately 700 tonnes of galvanised steel. Perimeter Crash
Rails, steel stairs and a new ramp to the existing structure
had also been included in the contract.
Page Steel offered their vast experience in multi level
construction to the client saving on site costs for handrail and
methods for seamless installation staging.