Project Statistics
The Dawson Street carpark was originaly design as a concrete
construction. Page Steel Fabrications together with Onesteel market
mills and the builder designed a steel composite alternative. The
steel option proved to be a more cost effective method and was
chosen as a succesful alternative. Page Steel Fabrications worked
closely with the engineer to design cost effective solutions for
the perimter crash rail, and lighten up floor beams. This
progressive colaboration has made this project a success.