Project Statistics

Location
Greensborough, Victoria
Client
Salta Property
Industry
High Rising
Size
200 tonnes

The steel multi level design had been chosen over a concrete design with cost inputs supplied by Page Steel showing the project could be built cheaper in steel. Existing site conditions with limited access helped the steel solution to be successfully chosen.

Page Steel adopted bolted angle connections to reduce fabrication hours. The steel solution also enabled the client to split the building into thirds, erect all levels in the zone, move onto the next zone and adopt that methodology for the entire project.