Project Statistics

Location
Cnr Grattan St & Royal Pde, Melbourne Victoria
Client
Industry
High Rising
Size
1,300 tonnes

Page Steel Fabrications are contracted to supply all drafting, Metal decking & shear Studs, Fabricated structural steel, Temporary handrail and site erection. The project comprises of 1300 tn of structural steel with majority being supplied uncoated. The VCCC project has been modelled and detailed in house by Page Steel Fabrications drafting department using Tekla Structures. Part of the conditions of construction had been the existing operating theatres situated directly below the first erection level had to keep functioning during construction. The tower crane and on site personal had to stand down when an helicopter landed on the adjacent helipad for the hospital to receive patients. A very small lay down area of one load only had been provided, so all loads had to be meticulously loaded with the correct staged steel. Page Steel Fabrications provided full coordination of the programming of steel erection / installation of temporary handrails and the fixing of the metal decking carefully following the very specific order of construction to facilitate the unique inner city existing hospital site

Download Project PDF
Let's discuss your next project: